The proposed underground Kalbadevi Metro station will be shifted about 20 m away from the nearest boundary wall of the H. B. Wadia Atash Behram on Princess Street, the Mumbai Metro Rail Corporation Limited (MMRCL) informed the Supreme Court on January 28, 2019. The earlier location of the station was very close to the fire temple with an overlap of 2 m. According to a report in The Times of India (ToI) dated January 29, there has been no change in the alignment of the Metro line — its tunnel will continue to pass 3.5 m within the Atash Behram......